Highway Construction — Aleutians West, Alaska

WD AK20260006-17987-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Aleutians West, Alaska (construction type: highway) is $50.79/hr base + $26.32/hr fringe = $77.11/hr total package (WD AK20260006-17987-hwy, Rev. 1).

Scroll down for all 35 trade classifications covered by this determination.

WD Number: AK20260006-17987-hwy
Revision: 1
Construction Type: highway
State: Alaska (AK)
County: Aleutians West
Effective: May 17, 2026
Trades covered: 35
Official source: SAM.gov reference AK20260006View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $50.79 $26.32 $77.11 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: Inside Journeyman Wireman.$ 53.44 30.52 CARPENTER $50.79 $26.86 $77.65 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: Fence Barrier Installer $42.99 $36.85 $79.84 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: Guardrail Installer $43.99 $36.85 $80.84 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: Guardrail Layout Man $43.73 $36.85 $80.58 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: Signalman, Stage Rigger, Structural, Ornamental, and Reinforcing $46.49 $36.85 $83.34 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER Group 1 $40.25 $34.41 $74.66 Top 10% +168% vs market $0.00 $0.00 $0.00 $0.00
LABORER Group 2 $41.25 $34.41 $75.66 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
LABORER Group 3 $42.15 $34.41 $76.56 Top 10% +175% vs market $0.00 $0.00 $0.00 $0.00
LABORER Group 3A $46.53 $34.41 $80.94 Top 10% +190% vs market $0.00 $0.00 $0.00 $0.00
LABORER Group 3B $54.01 $28.96 $82.97 Top 10% +198% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: Line Installer $53.53 $34.54 $88.07 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: Powderperson $70.59 $35.84 $106.43 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: Power Journeyworker Line $72.59 $35.90 $108.49 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: Tree Trimmer $42.23 $30.25 $72.48 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
PAINTER Brush and Roller $40.33 $26.17 $66.50 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
PAINTER Brush, Roll, and Spray $35.97 $28.52 $64.49 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
PAINTER Sandblast and Spray $40.85 $26.17 $67.02 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
PAINTER Sandblast and Structural Steel Painter $37.32 $28.52 $65.84 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER PERSON: Piledriver, Sheet Stabber $50.79 $26.32 $77.11 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER PERSON: Piledriver-Welder $51.79 $26.32 $78.11 Top 10% $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: First Judicial District $50.50 $30.87 $81.37 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: North of N 63 Latitude $51.66 $32.90 $84.56 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: South of N 63 Latitude $47.50 $32.45 $79.95 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 1 $53.23 $29.40 $82.63 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 1A $55.33 $29.40 $84.73 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 2 $52.32 $29.40 $81.72 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 3 $51.46 $29.40 $80.86 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 4 $44.06 $29.40 $73.46 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Group 1 $51.58 $29.42 $81.00 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Group 1A $53.05 $29.42 $82.47 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Group 2 $50.12 $29.42 $79.54 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Group 3 $49.17 $29.42 $78.59 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Group 4 $48.50 $29.42 $77.92 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: Group 5 $47.62 $29.42 $77.04 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Aleutians West, AK — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Aleutians West

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AK20260006-17987-hwy →