Residential Construction — Russell, Alabama

WD AL20260056-16638-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Russell, Alabama (construction type: residential) is $13.00/hr base + $0.00/hr fringe = $13.00/hr total package (WD AL20260056-16638-res, Rev. 1).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: AL20260056-16638-res
Revision: 1
Construction Type: residential
State: Alabama (AL)
County: Russell
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference AL20260056View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $13.00 $0.00 $13.00 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $10.40 $0.00 $10.40 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.00 $0.00 $18.00 -14% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $10.75 $0.00 $10.75 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $10.75 $0.00 $10.75 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $8.00 $0.00 $8.00 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $7.25 $0.00 $7.25 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $7.25 $0.00 $7.25 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $7.88 $0.00 $7.88 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $8.83 $0.00 $8.83 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $11.45 $0.00 $11.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $12.60 $0.00 $12.60 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $10.40 $0.00 $10.40 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $8.96 $0.00 $8.96 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $10.95 $0.00 $10.95 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 10.39 0.00 ROOFER, INCLUDES BUILT UP, METAL, SHAKE & SHINGLE, AND SINGLE PLY ROOFS $11.29 $0.00 $11.29 -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $10.06 $0.00 $10.06 -58% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Russell, AL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Russell

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260056-16638-res →