Residential Construction — Randolph, Alabama
WD AL20260034-16637-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Randolph, Alabama (construction type: residential) is $12.25/hr base + $0.00/hr fringe = $12.25/hr total package (WD AL20260034-16637-res, Rev. 1).
Scroll down for all 14 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $12.25 | $0.00 | $12.25 Bottom 10% -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES BLOWN INSULATION | $10.78 | $0.00 | $10.78 Above median -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.59 | $0.00 | $12.59 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $9.13 | $0.00 | $9.13 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $11.15 | $0.00 | $11.15 -56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $7.60 | $0.00 | $7.60 Bottom 10% -56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $7.27 | $0.00 | $7.27 Bottom 10% -58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.00 | $0.00 | $8.00 Bottom 10% -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $9.80 | $0.00 | $9.80 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $11.71 | $0.00 | $11.71 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING | $10.06 | $0.00 | $10.06 -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $11.18 | $0.00 | $11.18 Bottom 10% -57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 12.80 0.00 ROOFER, INCLUDES SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $7.25 | $0.00 | $7.25 -67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $10.08 | $0.00 | $10.08 -58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Randolph, AL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Randolph, Alabama.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.