Highway Construction — Marion, Alabama

WD AL20260137-15812-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Marion, Alabama (construction type: highway) is $15.25/hr base + $0.00/hr fringe = $15.25/hr total package (WD AL20260137-15812-hwy, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: AL20260137-15812-hwy
Revision: 1
Construction Type: highway
State: Alabama (AL)
County: Marion
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference AL20260137View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $15.25 $0.00 $15.25 -34% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.50 $0.00 $15.50 -26% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.41 $7.49 $27.90 +11% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $20.12 $0.00 $20.12 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.05 $0.00 $17.05 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER GRADE CHECKER $15.89 $0.00 $15.89 Above median -9% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $12.35 $0.00 $12.35 -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.17 $0.00 $12.17 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: EROSION CONTROL $12.35 $0.00 $12.35 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.48 $0.00 $13.48 -23% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $14.31 $0.00 $14.31 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.97 $0.00 $15.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $12.52 $0.00 $12.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.64 $0.00 $15.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.98 $0.00 $24.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $16.10 $0.00 $16.10 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.85 $0.00 $17.85 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.04 $0.00 $15.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $17.65 $0.00 $17.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $12.72 $0.00 $12.72 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.39 $0.00 $16.39 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.50 $0.00 $14.50 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $13.24 $0.00 $13.24 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $12.76 $0.00 $12.76 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.99 $0.00 $12.99 -46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $15.72 $0.00 $15.72 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $15.88 $0.00 $15.88 -34% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.95 $0.00 $12.95 -46% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Marion, AL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Marion

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260137-15812-hwy →