Residential Construction — Madison, Alabama

WD AL20260052-15811-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Madison, Alabama (construction type: residential) is $15.00/hr base + $0.00/hr fringe = $15.00/hr total package (WD AL20260052-15811-res, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: AL20260052-15811-res
Revision: 1
Construction Type: residential
State: Alabama (AL)
County: Madison
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference AL20260052View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $15.00 $0.00 $15.00 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $13.97 $2.73 $16.70 -27% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $10.10 $0.00 $10.10 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $10.82 $0.00 $10.82 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $10.46 $0.00 $10.46 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $16.36 $3.40 $19.76 -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $7.50 $0.00 $7.50 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $8.57 $0.00 $8.57 -51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $7.88 $0.00 $7.88 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $9.00 $0.00 $9.00 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $11.20 $0.00 $11.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.52 $0.00 $12.52 $0.00 $0.00 $0.00 $0.00
PAINTER $11.00 $0.00 $11.00 -50% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $12.51 $0.00 $12.51 -52% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, METAL, SHAKE & SHINGLE, AND SINGLE PLY ROOFS $9.17 $0.00 $9.17 -58% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $12.82 $0.00 $12.82 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $9.86 $0.00 $9.86 -59% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Madison, AL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Madison

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260052-15811-res →