Building Construction — Lee, Alabama
WD AL20260089-16636-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Lee, Alabama (construction type: building) is $31.10/hr base + $16.40/hr fringe = $47.50/hr total package (WD AL20260089-16636-bld, Rev. 1).
Scroll down for all 28 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.10 | $16.40 | $47.50 +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $34.21 | $23.92 | $58.13 +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $19.81 | $0.00 | $19.81 -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $18.20 | $0.00 | $18.20 -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.48 | $0.00 | $15.48 -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $18.09 | $2.61 | $20.70 -18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $18.89 | $0.00 | $18.89 Bottom 10% -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $22.86 | $7.94 | $30.80 Above median +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 Above median +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.94 | $0.00 | $11.94 -32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.00 | $0.00 | $11.00 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.42 | $0.00 | $11.42 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.58 | $0.00 | $12.58 -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $12.00 | $0.00 | $12.00 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $16.37 | $0.00 | $16.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $20.69 | $0.00 | $20.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $17.52 | $0.89 | $18.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $14.69 | $0.00 | $14.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.00 | $1.78 | $15.78 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $15.41 | $0.00 | $15.41 -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $14.31 | $0.00 | $14.31 Bottom 10% -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $32.30 | $17.96 | $50.26 +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $35.20 | $13.51 | $48.71 Above median +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $31.75 | $14.55 | $46.30 +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 14.78 0.00 ROOFER | $13.23 | $0.00 | $13.23 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $24.65 | $11.42 | $36.07 +39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $15.86 | $0.00 | $15.86 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $12.50 | $0.00 | $12.50 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Lee, AL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Lee
Compliance Notes
- This wage determination applies to federal contracts for building construction in Lee, Alabama.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.