Residential Construction — Lamar, Alabama

WD AL20260022-15787-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Lamar, Alabama (construction type: residential) is $12.20/hr base + $0.00/hr fringe = $12.20/hr total package (WD AL20260022-15787-res, Rev. 1).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: AL20260022-15787-res
Revision: 1
Construction Type: residential
State: Alabama (AL)
County: Lamar
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference AL20260022View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $12.20 $0.00 $12.20 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING $10.00 $0.00 $10.00 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.46 $0.00 $8.46 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $10.50 $0.00 $10.50 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $7.25 $0.00 $7.25 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $7.27 $0.00 $7.27 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $8.00 $0.00 $8.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $9.80 $0.00 $9.80 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $11.71 $0.00 $11.71 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING $9.92 $0.00 $9.92 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $13.00 $0.00 $13.00 -50% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 10.83 0.00 ROOFER, INCLUDES SHAKE & SHINGLE, AND SINGLE PLY ROOFS $7.50 $0.00 $7.50 -66% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $10.08 $0.00 $10.08 -58% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lamar, AL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lamar

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260022-15787-res →