Heavy Construction — Jackson, Alabama

WD AL20260001-15807-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for SELF-PROPELLED HOPPER DREDGE DRAG TENDERS THE FOLLOWING RATES WERE REVISED PURSUANT TO 29 CFR 1.6 ON 02/07/2025 in Jackson, Alabama (construction type: heavy) is $20.36/hr base + $7.24/hr fringe = $27.60/hr total package (WD AL20260001-15807-hvy, Rev. 1).

Scroll down for all 1 trade classifications covered by this determination.

WD Number: AL20260001-15807-hvy
Revision: 1
Construction Type: heavy
State: Alabama (AL)
County: Jackson
Effective: May 17, 2026
Trades covered: 1
Official source: SAM.gov reference AL20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
SELF-PROPELLED HOPPER DREDGE DRAG TENDERS THE FOLLOWING RATES WERE REVISED PURSUANT TO 29 CFR 1.6 ON 02/07/2025 $20.36 $7.24 $27.60 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jackson, AL — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jackson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260001-15807-hvy →