Highway Construction — Henry, Alabama

WD AL20260155-15799-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Henry, Alabama (construction type: highway) is $15.69/hr base + $0.00/hr fringe = $15.69/hr total package (WD AL20260155-15799-hwy, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: AL20260155-15799-hwy
Revision: 1
Construction Type: highway
State: Alabama (AL)
County: Henry
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference AL20260155View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $15.69 $0.00 $15.69 -32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.75 $0.00 $14.75 -30% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.90 $10.34 $41.24 +64% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $19.82 $0.00 $19.82 Above median $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $14.55 $0.00 $14.55 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.20 $0.00 $16.20 -34% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.40 $0.00 $22.40 -9% vs market $0.00 $0.00 $0.00 $0.00
LABORER GRADE CHECKER $14.31 $0.00 $14.31 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.19 $0.00 $16.19 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.82 $0.00 $11.82 -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $14.06 $0.00 $14.06 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.42 $0.00 $14.42 -17% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $16.00 $0.00 $16.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.71 $0.00 $15.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.88 $0.00 $13.88 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $13.38 $0.00 $13.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.08 $0.00 $15.08 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.88 $2.31 $22.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $18.52 $0.00 $18.52 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $26.73 $11.25 $37.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $19.17 $0.00 $19.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.00 $0.00 $17.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: MATERIAL TRANSFER VEHICLE $16.60 $0.00 $16.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $19.16 $0.00 $19.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $15.79 $0.00 $15.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $16.83 $0.00 $16.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $15.64 $0.00 $15.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.21 $0.00 $14.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $13.30 $0.00 $13.30 $0.00 $0.00 $0.00 $0.00
PAINTER $15.97 $1.27 $17.24 -22% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $13.01 $0.00 $13.01 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $13.86 $0.00 $13.86 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.41 $0.00 $14.41 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $15.00 $0.00 $15.00 -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $16.79 $0.00 $16.79 -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $15.56 $0.00 $15.56 Top 10% -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $13.50 $0.00 $13.50 -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Henry, AL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Henry

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260155-15799-hwy →