Heavy Construction — Greene, Alabama

WD AL20260121-15784-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Greene, Alabama (construction type: heavy) is $14.60/hr base + $0.00/hr fringe = $14.60/hr total package (WD AL20260121-15784-hvy, Rev. 1).

Scroll down for all 16 trade classifications covered by this determination.

WD Number: AL20260121-15784-hvy
Revision: 1
Construction Type: heavy
State: Alabama (AL)
County: Greene
Effective: May 17, 2026
Trades covered: 16
Official source: SAM.gov reference AL20260121View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.60 $0.00 $14.60 -37% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.94 $0.40 $12.34 -41% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.00 $16.22 $47.22 +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.75 $14.03 $47.78 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.96 $0.00 $8.96 -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $10.07 $1.37 $11.44 -34% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: BACKHOE, CRANE, CHERRY PICKER, FRONT END LOADER, HOIST, AND MECHANIC $31.52 $13.98 $45.50 +102% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: OILER $28.45 $13.98 $42.43 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $13.36 $0.00 $13.36 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.00 $0.65 $17.65 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $19.40 $5.76 $25.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.58 $4.66 $20.24 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.48 $2.70 $14.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $11.50 $0.44 $11.94 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $10.00 $0.00 $10.00 -58% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Greene, AL — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Greene

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260121-15784-hvy →