Heavy Construction — Greene, Alabama
WD AL20260121-15784-hvy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Greene, Alabama (construction type: heavy) is $14.60/hr base + $0.00/hr fringe = $14.60/hr total package (WD AL20260121-15784-hvy, Rev. 1).
Scroll down for all 16 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $14.60 | $0.00 | $14.60 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $11.94 | $0.40 | $12.34 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $31.00 | $16.22 | $47.22 +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $33.75 | $14.03 | $47.78 Above median +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $8.96 | $0.00 | $8.96 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $10.07 | $1.37 | $11.44 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATING ENGINEERS: BACKHOE, CRANE, CHERRY PICKER, FRONT END LOADER, HOIST, AND MECHANIC | $31.52 | $13.98 | $45.50 +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATING ENGINEERS: OILER | $28.45 | $13.98 | $42.43 Above median +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT SPREADER | $13.36 | $0.00 | $13.36 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $17.00 | $0.65 | $17.65 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $14.00 | $0.00 | $14.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $19.40 | $5.76 | $25.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.58 | $4.66 | $20.24 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $11.48 | $2.70 | $14.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACKHOE | $11.50 | $0.44 | $11.94 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $10.00 | $0.00 | $10.00 -58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Greene, AL — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Greene
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Greene, Alabama.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.