Building Construction — Etowah, Alabama

WD AL20260085-15778-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Etowah, Alabama (construction type: building) is $31.10/hr base + $16.40/hr fringe = $47.50/hr total package (WD AL20260085-15778-bld, Rev. 1).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: AL20260085-15778-bld
Revision: 1
Construction Type: building
State: Alabama (AL)
County: Etowah
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference AL20260085View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.10 $16.40 $47.50 +109% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $34.21 $23.92 $58.13 +91% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $22.00 $0.00 $22.00 -6% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $15.00 $1.50 $16.50 -28% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.91 $4.39 $23.30 +11% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $17.72 $2.31 $20.03 -21% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $33.75 $14.03 $47.78 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.75 $14.03 $47.78 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.50 $0.00 $12.50 -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.22 $0.00 $12.22 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $14.23 $0.00 $14.23 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.59 $0.00 $15.59 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.48 $11.20 $32.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.96 $0.40 $20.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.52 $0.89 $18.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.69 $0.00 $14.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.00 $1.78 $15.78 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $15.31 $1.41 $16.72 -24% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $14.31 $0.00 $14.31 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $20.78 $5.04 $25.82 +0% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $18.97 $0.36 $19.33 -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $32.57 $14.05 $46.62 +107% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $32.57 $14.05 $46.62 +107% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 23.25 4.17 ROOFER $13.66 $0.00 $13.66 -38% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $20.00 $0.00 $20.00 -3% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.60 $0.00 $13.60 -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Etowah, AL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Etowah

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260085-15778-bld →