Quick Answer

The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Bibb, Alabama (construction type: highway) is $17.18/hr base + $0.00/hr fringe = $17.18/hr total package (WD AL20260172-15780-hwy, Rev. 1).

Scroll down for all 46 trade classifications covered by this determination.

WD Number: AL20260172-15780-hwy
Revision: 1
Construction Type: highway
State: Alabama (AL)
County: Bibb
Effective: May 17, 2026
Trades covered: 46
Official source: SAM.gov reference AL20260172View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CEMENT MASON/CONCRETE FINISHER $17.18 $0.00 $17.18 -18% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.73 $0.00 $19.73 -22% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $16.69 $0.00 $16.69 Above median $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $11.95 $0.00 $11.95 Above median $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $20.32 $0.00 $20.32 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $14.62 $0.00 $14.62 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $17.24 $0.00 $17.24 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.97 $0.00 $17.97 -27% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.40 $0.00 $22.40 -9% vs market $0.00 $0.00 $0.00 $0.00
LABORER GRADE CHECKER $14.51 $0.00 $14.51 -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $13.48 $0.00 $13.48 -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.54 $0.00 $12.54 -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE WORKER $14.57 $0.00 $14.57 -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: EROSION CONTROL $10.91 $0.00 $10.91 Above median -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $14.05 $0.00 $14.05 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.50 $0.00 $16.50 Above median -5% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: AGGREGATE SPREADER $15.81 $0.00 $15.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $16.79 $0.00 $16.79 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.53 $0.00 $18.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.88 $0.00 $13.88 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $13.07 $0.00 $13.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.80 $0.00 $18.80 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $17.97 $0.00 $17.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $23.25 $0.00 $23.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $17.44 $0.00 $17.44 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRAGLINE $25.95 $11.25 $37.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.81 $0.00 $17.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.57 $0.00 $16.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: MATERIAL TRANSFER VEHICLE $16.89 $0.00 $16.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $21.67 $0.00 $21.67 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $16.42 $0.00 $16.42 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $16.83 $0.00 $16.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $17.41 $0.00 $17.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.43 $0.00 $15.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $13.30 $0.00 $13.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $12.50 $0.00 $12.50 $0.00 $0.00 $0.00 $0.00
PAINTER $15.97 $1.27 $17.24 -22% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $24.15 $9.36 $33.51 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $11.84 $0.00 $11.84 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $12.13 $0.00 $12.13 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.23 $0.00 $15.23 -37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $15.00 $0.00 $15.00 -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $17.86 $0.00 $17.86 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP TRUCK $15.97 $0.00 $15.97 -34% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $15.56 $0.00 $15.56 Top 10% -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $13.47 $0.00 $13.47 -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bibb, AL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.