Building Construction — Barbour, Alabama

WD AL20260078-15795-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Barbour, Alabama (construction type: building) is $34.21/hr base + $23.92/hr fringe = $58.13/hr total package (WD AL20260078-15795-bld, Rev. 1).

Scroll down for all 13 trade classifications covered by this determination.

WD Number: AL20260078-15795-bld
Revision: 1
Construction Type: building
State: Alabama (AL)
County: Barbour
Effective: May 17, 2026
Trades covered: 13
Official source: SAM.gov reference AL20260078View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $34.21 $23.92 $58.13 +91% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.00 $0.00 $20.00 -15% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $14.01 $0.00 $14.01 -39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.50 $1.12 $17.62 -16% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.15 $17.43 $49.58 +97% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.41 $0.00 $11.41 -35% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.48 $11.78 $32.26 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $15.83 $0.00 $15.83 -28% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $35.20 $13.51 $48.71 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $29.90 $14.55 $44.45 +97% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $29.90 $14.55 $44.45 +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $20.00 $10.94 $30.94 +40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.05 $0.00 $14.05 -42% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Barbour, AL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Barbour

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260078-15795-bld →