Heavy Construction — Baldwin, Alabama

WD AL20260104-15821-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Baldwin, Alabama (construction type: heavy) is $19.05/hr base + $7.86/hr fringe = $26.91/hr total package (WD AL20260104-15821-hvy, Rev. 1).

Scroll down for all 10 trade classifications covered by this determination.

WD Number: AL20260104-15821-hvy
Revision: 1
Construction Type: heavy
State: Alabama (AL)
County: Baldwin
Effective: May 17, 2026
Trades covered: 10
Official source: SAM.gov reference AL20260104View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $19.05 $7.86 $26.91 Above median +17% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES $13.78 $0.00 $13.78 -34% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.56 $0.00 $19.56 -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $10.00 $0.00 $10.00 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $11.95 $0.00 $11.95 Bottom 10% -32% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES $13.56 $0.00 $13.56 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER, INCLUDES WATER SEWER LINES $17.64 $2.14 $19.78 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE, EXCAVATOR, TRACKHOE $48.89 $18.00 $66.89 Top 10% +197% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $48.89 $18.00 $66.89 Above median +197% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $12.56 $2.12 $14.68 Above median -39% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Baldwin, AL — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Baldwin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260104-15821-hvy →