Highway Construction — Autauga, Alabama

WD AL20260147-15830-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Autauga, Alabama (construction type: highway) is $16.02/hr base + $0.00/hr fringe = $16.02/hr total package (WD AL20260147-15830-hwy, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: AL20260147-15830-hwy
Revision: 1
Construction Type: highway
State: Alabama (AL)
County: Autauga
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference AL20260147View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $16.02 $0.00 $16.02 -30% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.18 $0.00 $15.18 -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.90 $10.34 $41.24 +64% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $19.82 $0.00 $19.82 Above median $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $14.55 $0.00 $14.55 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.20 $0.00 $16.20 -34% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.40 $0.00 $22.40 -9% vs market $0.00 $0.00 $0.00 $0.00
LABORER GRADE CHECKER $14.08 $0.00 $14.08 -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $12.00 $0.00 $12.00 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.05 $0.00 $12.05 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: EROSION CONTROL $12.50 $0.00 $12.50 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $14.96 $0.00 $14.96 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.01 $0.00 $13.01 -25% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $16.00 $0.00 $16.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.52 $0.00 $17.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.88 $0.00 $13.88 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $14.57 $0.00 $14.57 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $14.46 $0.00 $14.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $23.10 $0.00 $23.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $16.12 $0.00 $16.12 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $26.73 $11.25 $37.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.98 $0.00 $17.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.55 $0.00 $15.55 $0.00 $0.00 $0.00 $0.00
OPERATOR: MATERIAL TRANSFER VEHICLE $16.60 $0.00 $16.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $18.59 $0.00 $18.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $15.79 $0.00 $15.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $16.83 $0.00 $16.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $15.96 $0.00 $15.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.48 $0.00 $14.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $13.30 $0.00 $13.30 $0.00 $0.00 $0.00 $0.00
PAINTER $15.97 $1.27 $17.24 -22% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $15.13 $0.00 $15.13 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $16.34 $0.00 $16.34 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.13 $0.00 $15.13 -37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $15.00 $0.00 $15.00 -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $17.50 $0.00 $17.50 Above median -27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $15.56 $0.00 $15.56 Top 10% -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $13.50 $0.00 $13.50 -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Autauga, AL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Autauga

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260147-15830-hwy →