| 1 |
Steamfitter Bucks, Chester, Delaware, Montgomery and Philadelphia Counties
|
$117.10/hr |
$117.10/hr |
10 |
| 2 |
BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUT
|
$112.06/hr |
$112.06/hr |
10 |
| 3 |
MORE OF SERVICE OR 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. EIGHT PAID HOLIDAYS: NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'
|
$110.29/hr |
$110.29/hr |
5 |
| 4 |
ELECTRICIAN (BUCKS COUNTY
|
$107.63/hr |
$107.63/hr |
10 |
| 5 |
ELECTRICIAN (MONROE, NORTHAMPTON AND PIKE COUNTIES)
|
$107.63/hr |
$107.63/hr |
29 |
| 6 |
ELECTRICIAN (BUCKS COUNTY (HILLTOWN AND NEW BRITAIN TOWNSHIPS IN THEIR ENTIRETY; THAT PORTION OF TELFORD BOROUGH NORTHEAST OF COUNTY LINE ROAD AND BOU
|
$105.21/hr |
$105.21/hr |
10 |
| 7 |
STEAMFITTER
|
$102.43/hr |
$117.10/hr |
40 |
| 8 |
Steamfitter
|
$102.43/hr |
$117.10/hr |
30 |
| 9 |
IRONWORKER, STRUCTURAL AND ORNAMENTAL (BUCKS: DELAWARE; CHESTER (INCLUDES THE TOWNS OF ALDHAM, ANSELMA, BACTON, BERWYN, CEDAR HOLLOW, CHARLESTOWN, CHE
|
$101.80/hr |
$101.80/hr |
10 |
| 10 |
IRONWORKER, STRUCTURAL AND ORNAMENTAL
|
$101.80/hr |
$101.80/hr |
12 |
| 11 |
DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING
|
$99.85/hr |
$99.85/hr |
27 |
| 12 |
LINE CONSTRUCTION: LINEMEN
|
$99.49/hr |
$99.49/hr |
124 |
| 13 |
Line Construction: Equipment Operator
|
$99.49/hr |
$99.49/hr |
124 |
| 14 |
LINE CONSTRUCTION: EQUIPMENT OPERATOR
|
$99.49/hr |
$99.49/hr |
124 |
| 15 |
Line Construction: Linemen
|
$99.49/hr |
$99.49/hr |
124 |
| 16 |
DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING
|
$97.14/hr |
$97.14/hr |
10 |
| 17 |
THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE
|
$93.66/hr |
$105.81/hr |
20 |
| 18 |
LINE
|
$92.68/hr |
$92.68/hr |
10 |
| 19 |
PLUMBER (BERKS, LEHIGH, LEBANON, AND NORTHAMPTON COUNTIES)
|
$91.79/hr |
$91.79/hr |
29 |
| 20 |
HANDLING MACHINERY; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS 120 FEET OF BOOM
|
$90.90/hr |
$90.90/hr |
10 |
| 21 |
POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBLIC YARD FACTORY R
|
$90.58/hr |
$90.58/hr |
10 |
| 22 |
SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLY FOOTNOTE: PAID HOLIDAY: ELECTION DAY
|
$89.11/hr |
$113.28/hr |
5 |
| 23 |
SHEET METAL WORKER. FOOTNOTES: PAID HOLIDAY: ELECTION DAY
|
$89.11/hr |
$89.11/hr |
29 |
| 24 |
SHEET METAL WORKER FOOTNOTE; PAID HOLIDAY; ELECTION DAY
|
$89.11/hr |
$89.11/hr |
33 |
| 25 |
Diver
|
$88.12/hr |
$88.12/hr |
99 |
| 26 |
DIVER
|
$88.12/hr |
$88.12/hr |
99 |
| 27 |
POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION: GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HO
|
$87.01/hr |
$87.01/hr |
10 |
| 28 |
POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION: GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEY
|
$86.69/hr |
$86.69/hr |
10 |
| 29 |
IRONWORKER, REINFORCING Philadelphia County
|
$86.44/hr |
$86.44/hr |
10 |
| 30 |
IRONWORKER: REINFORCING: THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW
|
$86.44/hr |
$86.44/hr |
10 |
| 31 |
CARPENTER (Installer-Siding
|
$85.91/hr |
$85.91/hr |
5 |
| 32 |
ELECTRICIAN (ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON, CENTRE, CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, IND
|
$85.90/hr |
$85.90/hr |
99 |
| 33 |
SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY
|
$85.61/hr |
$85.61/hr |
12 |
| 34 |
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY
|
$85.61/hr |
$113.28/hr |
13 |
| 35 |
MILLWRIGHT (CARBON , LEHIGH AND NORTHAMPTON COUNTIES)
|
$85.25/hr |
$85.25/hr |
87 |
| 36 |
IRONWORKER, REINFORCING Bucks, Chester, Delaware and Montgomery Counties
|
$83.85/hr |
$83.85/hr |
10 |
| 37 |
IRONWORKER, REINFORCING THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW Y
|
$83.85/hr |
$86.44/hr |
11 |
| 38 |
LINE CONSTRUCTION: CABLE SPLICER
|
$82.92/hr |
$95.46/hr |
200 |
| 39 |
LINE CONSTRUCTION: LINEMAN
|
$82.92/hr |
$95.46/hr |
205 |
| 40 |
Machinery Mover) Philadelphia County
|
$82.91/hr |
$82.91/hr |
10 |
| 41 |
Painters: All Other Work
|
$82.90/hr |
$82.90/hr |
10 |
| 42 |
PAINTERS
|
$82.90/hr |
$93.90/hr |
23 |
| 43 |
IRONWORKER, RIGGER AND MACHINERY MOVER: THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE
|
$81.87/hr |
$82.91/hr |
20 |
| 44 |
BOILERMAKER
|
$81.45/hr |
$90.48/hr |
926 |
| 45 |
POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION: GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH, MOTOR PATROLS, F
|
$81.40/hr |
$81.40/hr |
10 |
| 46 |
POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION: GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CO
|
$81.01/hr |
$81.01/hr |
10 |
| 47 |
IRONWORKER Bucks, Chester, Delaware and Montgomery Counties
|
$80.82/hr |
$80.82/hr |
10 |
| 48 |
SPRINKLER FITTER
|
$80.01/hr |
$100.47/hr |
124 |
| 49 |
OPERATOR: Backhoe/Excavator/Trackhoe
|
$79.69/hr |
$79.69/hr |
34 |
| 50 |
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRIS
|
$79.69/hr |
$79.69/hr |
18 |