| 1 |
ELECTRICIAN WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS
|
$113.34/hr |
$118.39/hr |
6 |
| 2 |
ELECTRICIAN: CABLE SPLICER (MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River
|
$111.91/hr |
$111.91/hr |
11 |
| 3 |
WORK ON LINE VOLTAGE OF 440 OR 480 VOLTS: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS, FRAMES, LADDERS AND POLES, 40 FT. OR MORE ABOVE THE G
|
$110.90/hr |
$119.58/hr |
6 |
| 4 |
ELEVATOR A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight Paid
|
$110.29/hr |
$110.29/hr |
5 |
| 5 |
WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES T
|
$108.29/hr |
$113.99/hr |
8 |
| 6 |
Power equipment operators: Steel erection: GROUP 1
|
$107.74/hr |
$107.74/hr |
22 |
| 7 |
LINE CONSTRUCTION:: LINEMAN (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DE
|
$107.42/hr |
$107.42/hr |
10 |
| 8 |
SPRINKLER FITTER: FIRE SPRINKLERS
|
$107.32/hr |
$111.32/hr |
6 |
| 9 |
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION
|
$107.14/hr |
$107.14/hr |
5 |
| 10 |
PLUMBER
|
$107.06/hr |
$107.14/hr |
64 |
| 11 |
PIPEFITTER
|
$107.06/hr |
$107.17/hr |
69 |
| 12 |
POWER EQUIPMENT OPERATORS: STEEL ERECTION: CRANES; DERRICKS HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE
|
$106.91/hr |
$107.74/hr |
22 |
| 13 |
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: CRANES; DERRICKS HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SIT
|
$106.91/hr |
$107.74/hr |
20 |
| 14 |
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION
|
$106.54/hr |
$107.14/hr |
6 |
| 15 |
SHEET METAL WORKER
|
$106.14/hr |
$113.28/hr |
34 |
| 16 |
ELECTRICIAN: CABLE SPLICER (BURLINGTON COUNTY; MERCER COUNTY
|
$105.81/hr |
$105.81/hr |
10 |
| 17 |
ELECTRICIAN HUNTERDON COUNTY (Township of Delaware; Township of East Amwell; Borough of Flemington; City of Lambertville; Township of Raritan; Borough
|
$105.81/hr |
$105.81/hr |
11 |
| 18 |
MARBLE SETTER
|
$105.63/hr |
$105.63/hr |
10 |
| 19 |
Marble setter
|
$105.63/hr |
$105.63/hr |
10 |
| 20 |
CARPENTER All other work
|
$105.42/hr |
$105.42/hr |
7 |
| 21 |
DOCK BUILDER & PILEDRIVERMEN WORK ON LAND PILE DRIVING, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $.25 PER HOUR ADDI
|
$105.42/hr |
$105.42/hr |
21 |
| 22 |
Dock Builder & Piledrivermen
|
$105.42/hr |
$105.42/hr |
21 |
| 23 |
TERRAZZO WORKER/SETTER
|
$104.59/hr |
$104.59/hr |
8 |
| 24 |
ELECTRICIAN AND CABLE SPLICER
|
$103.81/hr |
$103.81/hr |
11 |
| 25 |
ELECTRICIANS:: ELECTRICIAN AND CABLE SPLICER (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BO
|
$103.81/hr |
$103.81/hr |
10 |
| 26 |
ELECTRICIAN
|
$103.62/hr |
$105.81/hr |
15 |
| 27 |
Electrician & Cable Splicer
|
$103.62/hr |
$103.62/hr |
14 |
| 28 |
BRICKLAYER WORK 100 DEGREES F. AND OVER: TO BE PAID AT THE RATE OF DOUBLE TIME. WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL
|
$103.62/hr |
$103.62/hr |
10 |
| 29 |
POWER EQUIPMENT OPERATORS: STEEL ERECTION: OILER; DECKHAND HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE
|
$103.24/hr |
$103.24/hr |
11 |
| 30 |
POWER EQUIPMENT OPERATORS:, STEEL ERECTION: OILER; DECKHAND HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE
|
$103.24/hr |
$103.24/hr |
10 |
| 31 |
GROUP 7
|
$103.24/hr |
$103.24/hr |
21 |
| 32 |
IRONWORKERS: STRUCTURAL (BERGEN, ESSEX, HUDSON AND HUNTERDON COUNTIES; MIDDLESEX COUNTY; MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY; SUSSEX AND UNIO
|
$102.56/hr |
$102.56/hr |
11 |
| 33 |
Structural, Ornamental
|
$102.56/hr |
$102.56/hr |
14 |
| 34 |
IRONWORKERS: STRUCTURAL (MONMOUTH COUNTY; OCEAN COUNTY
|
$102.56/hr |
$102.56/hr |
10 |
| 35 |
MONMOUTH COUNTY; OCEAN COUNTY: Structural
|
$102.56/hr |
$102.56/hr |
10 |
| 36 |
IRONWORKER: STRUCTURAL
|
$102.56/hr |
$102.56/hr |
19 |
| 37 |
IRONWORKER Structural
|
$102.56/hr |
$102.56/hr |
17 |
| 38 |
SUSSEX AND UNION COUNTIES: Structural
|
$102.56/hr |
$102.56/hr |
11 |
| 39 |
TILE SETTER
|
$102.18/hr |
$102.18/hr |
18 |
| 40 |
Tile setter
|
$102.18/hr |
$102.18/hr |
18 |
| 41 |
POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTER PILOT; HELICOPTER ENGINEER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDO
|
$101.04/hr |
$101.04/hr |
21 |
| 42 |
ELECTRICIAN (MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin (east of a line following Cedar Grove Lane from the Raritan River, in a southwest
|
$100.54/hr |
$100.54/hr |
11 |
| 43 |
IRONWORKERS: REINFORCING (BERGEN, ESSEX, HUDSON AND HUNTERDON COUNTIES; MIDDLESEX COUNTY; MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY; SUSSEX AND UNI
|
$100.26/hr |
$100.26/hr |
11 |
| 44 |
IRONWORKER: REINFORCING
|
$100.26/hr |
$100.26/hr |
53 |
| 45 |
IRONWORKER Reinforcing
|
$100.26/hr |
$100.26/hr |
31 |
| 46 |
IRONWORKERS: REINFORCING (MONMOUTH COUNTY; OCEAN COUNTY
|
$100.26/hr |
$100.26/hr |
10 |
| 47 |
Ironworkers: Reinforcing
|
$100.26/hr |
$100.26/hr |
49 |
| 48 |
LINE CONSTRUCTION: CABLE SPLICER. (MIDDLESEX COUNTY; SOMERSET COUNTY (Township of Franklin)
|
$99.75/hr |
$99.76/hr |
22 |
| 49 |
POWER EQUIPMENT OPERATORS: BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Bir
|
$99.22/hr |
$99.22/hr |
19 |
| 50 |
POWER EQUIPMENT OPERATORS: GROUP 1 AUTOGRADE - COMBINATION SUBGRADER; BASE METAL SPREADER AND BASE TRIMMER; AUTOGRADE PLACER - TRIMMER SPREADER COMBIN
|
$99.22/hr |
$99.22/hr |
21 |